Example of bandage tape installation
Sequence of operations for installation of bandage tape and tools required for that are as follows.
1. Lead the bandage tape end into the clamp.
2. Wrap the pole.

3. Lead the other end of the tape into the tensioner.

4. Tension the tape, and then turn down the tool following the arrow.

5. Cut the tape with a help of a cutting mechanism built into the tensioner.

6. Appearance after tensioning and tape cutting.

7. Turn down the tape remainder after cutting.

8. Turn the tabs down.

9. Done.

Similar materials
Last news